Compliance Requirements for Mall / Shopping Center
in ICAD Industrial City
Full step-by-step guide with costs, timeline and government authorities
This is the general path for this facility type, not a path specific to ICAD Industrial City. The core requirements are the same, but the authority or the zone operator may add local conditions — confirm them before you proceed.
Government Authorities
Compliance Roadmap — Step by Step
📋 Trade Licence & Shopping Centre Licence
ADDED🏅 Building Completion Certificate & Requirements Compliance
Municipality📐 Approved Safety & Evacuation Drawings from Engineering Consultant
Municipality📝 Hassantuk System Registration — Corporate Level
Hassantuk🔧 Alarm, Suppression & Water Sprinkler System — Class A+B
ADCDA👷 Emergency Team Training & Approved Evacuation Plan
ADCDA🤝 Periodic Maintenance Contracts with Certified Safety Companies
ADCDA✅ Comprehensive Inspection & Civil Defence Certificate
ADCDA✅ Load Demand Notification (LDN) with the distribution company
TAQA✅ Electricity connection approval and connection agreement
TAQA🔧 Electrical installation, testing and commissioning
DoERelated pages
Same facility, other zones
Other facilities, same zone