Compliance requirements
Derived directly from the approved compliance path and the SafePass deterministic engine — the steps, what each one needs, and who is qualified to do it.
This is the general path for this facility type. The zone operator may add local conditions — confirm them before you proceed.
Applicable sectors
Licences, approvals and registrations with the authorities
Trade Licence & Shopping Centre Licence
ADDEDBuilding Completion Certificate & Requirements Compliance
MunicipalityRequires first: Safety drawings from an approved consultant
Hassantuk System Registration — Corporate Level
HassantukConnection to the national monitoring network through an approved communicator unit.
Comprehensive Inspection & Civil Defence Certificate
ADCDAInspection and integrated testing precede issuance of the certificate.
Requires first: Safety drawings from an approved consultant, Annual maintenance contract
Load Demand Notification (LDN) with the distribution company
TAQAApplies to a new supply or an approved load increase. Filed through the distribution company service code TAQA.20; the service is free with a published three-working-day review. The notification is built on the maximum demand calculation and diversity factors — see the project zone loads and machine datasheet guides.
Requires first: Trade licence from ADDED
Electricity connection approval and connection agreement
TAQADetermined once the load is accepted: the connection voltage (low or medium) and the point of supply, and an on-plot substation may be required depending on the load — there is no fixed kVA threshold; it is settled with the distribution company.
Requires first: Load Demand Notification (LDN)
Drawings, installation and execution
Approved Safety & Evacuation Drawings from Engineering Consultant
MunicipalityMost rejections originate here - review the plan rejection guide before submitting.
Requires first: Trade licence from ADDED
Alarm, Suppression & Water Sprinkler System — Class A+B
ADCDARequires a Class B company; design density and the remote area follow the hazard classification.
Requires first: Safety drawings from an approved consultant
Emergency Team Training & Approved Evacuation Plan
ADCDAAn approved plan with documented training of the emergency teams.
Requires first: Trade licence from ADDED
Periodic Maintenance Contracts with Certified Safety Companies
ADCDAThe contract must be with a Class G company for system maintenance and contract documentation.
Electrical installation, testing and commissioning
DoEExecuted to the Abu Dhabi Electricity Wiring Regulations (2020 Edition) and tested before energisation: earthing, insulation, conductor continuity and board compliance. The contractor must be qualified with the distribution company.
Requires first: Electricity connection approval
The same compliance path mapped onto each zone of the Emirate of Abu Dhabi.
Abu Dhabi
Al Dhafra
It takes under a minute and needs no account.
Reference guidance derived from the approved compliance path; the competent authority issues the final requirements.