Compliance requirements
Derived directly from the approved compliance path and the SafePass deterministic engine — the steps, what each one needs, and who is qualified to do it.
This is the general path for this facility type. The zone operator may add local conditions — confirm them before you proceed.
Applicable sectors
Licences, approvals and registrations with the authorities
Trade Licence from ADDED or DED (depending on location)
ADDEDPharmacy Licence from DOH Abu Dhabi
DOHRequires first: Trade licence from ADDED
Building Completion Certificate from Municipality
MunicipalityHassantuk System Registration
HassantukConnection to the national monitoring network through an approved communicator unit.
ADCDA Civil Defence Certificate
ADCDAInspection and integrated testing precede issuance of the certificate.
Requires first: Annual maintenance contract
Load Demand Notification (LDN) with the distribution company
TAQAApplies to a new supply or an approved load increase. Filed through the distribution company service code TAQA.20; the service is free with a published three-working-day review. The notification is built on the maximum demand calculation and diversity factors — see the project zone loads and machine datasheet guides.
Requires first: Trade licence from ADDED
Electricity connection approval and connection agreement
TAQADetermined once the load is accepted: the connection voltage (low or medium) and the point of supply, and an on-plot substation may be required depending on the load — there is no fixed kVA threshold; it is settled with the distribution company.
Requires first: Load Demand Notification (LDN)
Drawings, installation and execution
Alarm & Suppression System Installation — Class A
ADCDARequires a Class B company; design density and the remote area follow the hazard classification.
Annual Maintenance Contract with Certified Safety Company
ADCDAThe contract must be with a Class G company for system maintenance and contract documentation.
Electrical installation, testing and commissioning
DoEExecuted to the Abu Dhabi Electricity Wiring Regulations (2020 Edition) and tested before energisation: earthing, insulation, conductor continuity and board compliance. The contractor must be qualified with the distribution company.
Requires first: Electricity connection approval
The same compliance path mapped onto each zone of the Emirate of Abu Dhabi.
Abu Dhabi
Al Dhafra
It takes under a minute and needs no account.
Reference guidance derived from the approved compliance path; the competent authority issues the final requirements.