Compliance requirements
Derived directly from the approved compliance path and the SafePass deterministic engine — the steps, what each one needs, and who is qualified to do it.
This is the general path for this facility type. The zone operator may add local conditions — confirm them before you proceed.
Applicable sectors
Licences, approvals and registrations with the authorities
Petrol Station Licence from ADDED
ADDEDMOIAT Storage Approval
MOIATRequires first: Trade licence from ADDED
Structural Requirements Compliance Certificate
MunicipalityRequires first: Safety drawings from an approved consultant
Hassantuk System Registration
HassantukConnection to the national monitoring network through an approved communicator unit.
ADCDA Civil Defence Certificate for Petrol Stations
ADCDAInspection and integrated testing precede issuance of the certificate.
Requires first: Safety drawings from an approved consultant, Annual maintenance contract
Drawings, installation and execution
Fire Safety Drawings for Petrol Stations
MunicipalityMost rejections originate here - review the plan rejection guide before submitting.
Requires first: Trade licence from ADDED
Foam Suppression System Installation — Specialist Class B
ADCDAA special hazard for flammable liquids - requires Class B and C competence.
Requires first: Safety drawings from an approved consultant
Fuel Emergency Evacuation Plan
ADCDAAn approved plan with documented training of the emergency teams.
Requires first: Trade licence from ADDED
Annual Maintenance Contract with Certified Safety Company
ADCDAThe contract must be with a Class G company for system maintenance and contract documentation.
It takes under a minute and needs no account.
Reference guidance derived from the approved compliance path; the competent authority issues the final requirements.